30 Jan Flowline Installation
Posted January 30, 2014
in
The majority of our Oilfield work is conducted in the DJ Basin of Colorado. This tank battery shows flowline installation by MMWF, coming out of the separator. The flowlines’ main job are to get the oil and gas from the well to the separator. This is Rick Sublette’s area of expertise and he has made a name for him self in the DJ Basin, always striving to complete the job safely, on budget, and on time.